The launch erector tower is lowered, exposing the Gemini-4 spacecraft and launch vehicle just minutes before the launching from Pad 19 at 10:16 a.m., EST. Difficulty in lowering the erector delayed the lift off time, which had been scheduled for 9 a.m. EST.
Download
this image
High-Res
( Kbytes - × pixels)
Large-size file for the best quality. Should
take long time on slow connections
Medium-Res
( Kbytes - × pixels)
Medium-size file, good quality. Works well on
slow connections
Low-Res
( Kbytes - × pixels)
Small-size file, poor quality. Very quick
download even on slow connections
Notes
on this image:
Alternative PhotoIDs: 65-H-929
Keywords: Gemini 4 GT 4 Cape Kennedy
Image
quality: 5/5. You can obtain 16x20 inches (or smaller) photographic prints of this image.